One day to go before the second storey slab is to be laid… so much was still to be done. The day started with most of us continuing tying the reinforcement bars down. Meanwhile Simon, Aaron and the local workers made chutes that will be used to assist the pouring. Which was after they had finished off the ramp that everything will be slowly but surely carried up tomorrow.
The fruits of our tedious labour will be realized after the concrete is all poured. Fortunately we have the assistance of 15 able bodied men from the local Bible College. Pray for a little rain, cooler temperatures and strength to make it through what is anticipated to be a 12-15 hour long day.
The fruits of our tedious labour will be realized after the concrete is all poured. Fortunately we have the assistance of 15 able bodied men from the local Bible College. Pray for a little rain, cooler temperatures and strength to make it through what is anticipated to be a 12-15 hour long day.
2 comments:
Praying for a particularly good rest for all of you tonight as you get ready for a big day tomorrow - and for strength and safety throughout the day. Looks like you're doing some pretty impressive work. Hang in there!
You are doing fantastic work. You can be very pleased with yourselves.
We pray daily for the strength you need to face that day's jobs.
To the group from ACC (that includes Alison and the Big Yak!)we want you to give yourselves a big pat on the back. We are proud of you. Hope Huntz is doing okay.
Just to let you know that Jean and Trish have been painting the library (and ourselves:) ) over 3 days - you'll get a HUGE surprise.
God bless,take care and stay safe.
Post a Comment